section 033000 castinplace concrete scope: a. b.

section 033000 castinplace concrete scope: a. b.

SECTION 033000 CAST-IN-PLACE CONCRETE

2011-7-8  SECTION 033000 CAST-IN-PLACE CONCRETE 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section. 1.2 SUMMARY A. This Section specifies cast-in place concrete, including formwork, reinforcement, concrete

get price

SECTION 033000 - CAST-IN-PLACE CONCRETE

2011-11-3  SECTION 033000 - CAST-IN-PLACE CONCRETE Author: LBNL Keywords: 033000 Description: 9-30-08 LBNL MASTER SPEC REVISED Last modified by: ftangliss Created Date: 12/1/2010 2:26:00 PM Category: 03301 - Concrete Other titles: SECTION 033000 - CAST-IN-PLACE CONCRETE

get price

SECTION 033000 - CAST-IN-PLACE CONCRETE

2013-6-26  SECTION 033000 - CAST-IN-PLACE CONCRETE PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section. 1.2 SUMMARY A. Section includes cast-in-place concrete, including formwork, reinforcement, concrete ...

get price

SECTION 033000 - CAST-IN-PLACE CONCRETE

2013-6-10  CAST-IN-PLACE CONCRETE 033000 - 1 Lutheran Church of the Holy Spirit SECTION 033000 - CAST-IN-PLACE CONCRETE PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section. 1.2 SUMMARY

get price

SECTION 033000 - CAST-IN-PLACE CONCRETE

2020-8-3  CAST-IN-PLACE CONCRETE 033000 - 1 SECTION 033000 - CAST-IN-PLACE CONCRETE PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section. 1.2 SUMMARY

get price

SECTION 033000 - CAST-IN-PLACE CONCRETE

2021-6-29  SECTION 03 30 00. CAST-IN-PLACE CONCRETE. BASED ON DFD MASTER SPECIFICATION DATED . 8-2. 8-2019. This section has been written to cover most (but not all) situations that you will encounter. Depending on the requirements of your specific project, you may have to add material, delete items, or modify what is currently written.

get price

SECTION 033000 - CAST-IN-PLACE CONCRETE PART 1

2012-5-9  SECTION 033000 - CAST-IN-PLACE CONCRETE PART 1 GENERAL 1.01 SCOPE A. This section of specifications includes all labor , supervision, equipment, tools, materials and all other means of construction necessary to perform the cast-in-place concrete work as shown on the drawings, described in this specification, or as is necessary to complete the ...

get price

NEW DOUGLAS ELEMENTARY SCHOOL CAST-IN-PLACE

2011-2-21  CAST-IN-PLACE CONCRETE 033000-1 SECTION 033000 CAST-IN-PLACE CONCRETE PART 1 GENERAL 1.01 GENERAL REQUIREMENTS A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION. B. Examine all conditions as they exist at the project prior to submitting a bid for the work of this SECTION. 1.02 SCOPE OF WORK A.

get price

SECTION 033000 - CAST-IN-PLACE CONCRETE

2017-5-8  DMR Project #3578 033000 - 1 Cast-in-place Concrete SECTION 033000 - CAST-IN-PLACE CONCRETE PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section. 1.2 SUMMARY

get price

SECTION 033000 - CAST-IN-PLACE CONCRETE

2017-9-22  B. Deposit concrete continuously in one layer or in horizontal layers of such thickness that no new concrete will be placed on concrete that has hardened enough to cause seams or planes of weakness. If a section cannot be placed continuously, provide construction joints as indicated. Deposit concrete to avoid segregation. 1.

get price

SECTION 033000 - CAST-IN-PLACE CONCRETE

2018-6-22  B. Deposit concrete continuously in one layer or in horizontal layers of such thickness that no new concrete will be placed on concrete that has hardened enough to cause seams or planes of weakness. If a section cannot be placed continuously, provide construction joints as indicated. Deposit concrete to avoid segregation. 1.

get price

SECTION 033000 - CAST-IN-PLACE CONCRETE PART 1

2012-5-9  SECTION 033000 - CAST-IN-PLACE CONCRETE PART 1 GENERAL 1.01 SCOPE A. This section of specifications includes all labor , supervision, equipment, tools, materials and all other means of construction necessary to perform the cast-in-place concrete work as shown on the drawings, described in this specification, or as is necessary to complete the ...

get price

SECTION 033000 – CAST-IN-PLACE CONCRETE PART 1 -

2021-5-25  SECTION 033000 – CAST-IN-PLACE CONCRETE PART 1 - GENERAL 1.1 WORK INCLUDED A. Furnishing, forming, placing, finishing, curing and other related work of cast-in-place concrete for water line thrust blocking and other structures as required. 1.2 REFERENCES A. ACI 305 - Hot Weather Concreting. B. ACI 306 - Cold Weather Concreting.

get price

SECTION 033000 - CAST-IN-PLACE CONCRETE

2013-6-10  CAST-IN-PLACE CONCRETE 033000 - 1 Lutheran Church of the Holy Spirit SECTION 033000 - CAST-IN-PLACE CONCRETE PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section. 1.2 SUMMARY

get price

SECTION 033000 - CAST-IN-PLACE CONCRETE

2017-5-8  DMR Project #3578 033000 - 1 Cast-in-place Concrete SECTION 033000 - CAST-IN-PLACE CONCRETE PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section. 1.2 SUMMARY

get price

SECTION 033000 - CAST-IN-PLACE CONCRETE PART 1 -

2019-9-26  B. Deposit concrete continuously in one layer or in horizontal layers of such thickness that no new concrete will be placed on concrete that has hardened enough to cause seams or planes of weakness. If a section cannot be placed continuously, provide construction joints as indicated. Deposit concrete to avoid segregation. 1.

get price

SECTION 033000 - CAST-IN-PLACE CONCRETE

2021-6-29  SECTION 03 30 00. CAST-IN-PLACE CONCRETE. BASED ON DFD MASTER SPECIFICATION DATED . 8-2. 8-2019. This section has been written to cover most (but not all) situations that you will encounter. Depending on the requirements of your specific project, you may have to add material, delete items, or modify what is currently written.

get price

SECTION 033000 CAST-IN-PLACE CONCRETE PART 1

2013-11-7  CAST-IN-PLACE CONCRETE 033000- 1 SECTION 033000 CAST-IN-PLACE CONCRETE PART 1 GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Special Conditions and Division 1 Specification Sections, apply to work of this Section. B. Specification 072616 – Under Slab Vapor Barrier.

get price

SECTION 033000 - CAST-IN-PLACE CONCRETE

2014-4-3  DIVISION 03 – CONCRETE SECTION 033000 – CAST-IN-PLACE CONCRETE Joliet Township High School District 204 033000 - 2 02-4926-58 Joliet Central High School – Student Center Addition 1.5 ACTION SUBMITTALS A. Product Data: For each type of product indicated. B. Design Mixtures: For each concrete mixture.

get price

SECTION 033000 - CAST-IN-PLACE CONCRETE

2017-9-22  B. Deposit concrete continuously in one layer or in horizontal layers of such thickness that no new concrete will be placed on concrete that has hardened enough to cause seams or planes of weakness. If a section cannot be placed continuously, provide construction joints as indicated. Deposit concrete to avoid segregation. 1.

get price

SECTION 033000 CAST-IN-PLACE CONCRETE PART 1

2013-11-7  CAST-IN-PLACE CONCRETE 033000- 1 SECTION 033000 CAST-IN-PLACE CONCRETE PART 1 GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Special Conditions and Division 1 Specification Sections, apply to work of this Section. B. Specification 072616 – Under Slab Vapor Barrier.

get price

03 30 00 - CAST-IN-PLACE CONCRETE

2004-8-17  A. Portland cement concrete specified in Section 03 05 15 - Portland Cement Concrete. B. Finishing and curing of formed and unformed concrete surfaces, including repair and patching of surface defects, are specified in Section 03 35 00 - Concrete Finishing. C. Shotcrete is specified in Section

get price

SECTION 033000 - CAST-IN-PLACE CONCRETE

2016-3-30  SECTION 033000 – CAST-IN-PLACE CONCRETE. GENERAL. DESCRIPTION. This section describes materials and proportioning of cast in place concrete and general cast in place concrete requirements. RELATED WORK SPECIFIED ELSEWHERE. Section 031100, Concrete Formwork. Section 032000, Concrete Reinforcing. REFERENCES. ACI: American Concrete Institute:

get price

03 30 00 (03300) Cast-In-Place Concrete - WBDG

2016-10-24  SECTION 03 30 00 (SECTION 03300) - CAST-IN-PLACE CONCRETE SPECIFIER NOTE: resource management: Improper mining of raw materials (aggregate and components of portland cement: limestone, oxides of calcium silicon, clay, shale, and sand)

get price

033000 - Cast-in-Place Concrete

2020-2-27  Concrete Production Facilities." 1.4 FORM-FACING MATERIALS A. Smooth-Formed Finished Concrete: Form-facing panels that will provide continuous, true, and smooth concrete surfaces. Furnish in largest practicable sizes to minimize number of joints. B. Rough-Formed Finished Concrete: Plywood, lumber, metal, or another approved material.

get price

SECTION 03300 - CAST-IN-PLACE CONCRETE

2007-7-12  SECTION 033000 - CAST-IN-PLACE CONCRETE PART 1 - GENERAL 1.1 RELATED SECTIONS . A. 014000 Quality Requirements . B. 312000 Earth Moving. 1.2 SECTION REQUIREMENTS . A. Submittals: Product Data. B. Ready-Mixed Concrete Producer Qualifications: ASTM C 94/C 94M. C.

get price

SECTION 033000 - CAST-IN-PLACE CONCRETE

2017-4-12  Section 033300 "Architectural Concrete" for general building applications of specially finished formed concrete. Section 035300 "Concrete Topping" for emery- and iron-aggregate concrete floor toppings. Section 312000 "Earth Moving" for drainage fill under slabs-on-grade. Section 321313 "Concrete Paving" for concrete pavement and walks.

get price

SECTION 033000 - CAST-IN-PLACE CONCRETE

2017-7-14  SECTION 033000 - CAST-IN-PLACE CONCRETE Subject: CAST-IN-PLACE CONCRETE Author: ARCOM, Inc. Keywords: BAS-12345-MS80 Last modified by: glennw Created Date: 7/14/2017 8:22:00 PM Company: The Sky Factory Other titles: SECTION 033000 - CAST-IN-PLACE CONCRETE

get price

SECTION 03300 - Cast-In-Place Concrete

2016-3-4  A. Scope: The Work of this Section includes all material and installation of cast-in-place Concrete, including formwork, reinforcement, concrete materials, mix design, placement procedures, and finishes as shown and detailed on the Drawings and specified herein.

get price